461 |
Transfer of stores from stock from division to division. |
EM1(10)83/Vol.IX Dt. 10.2.94 |
10-Feb-1994 |
Size :237.37 KB
|
462 |
Provision of flushing valve system. |
EM1(10)83/Vol.IX Ref. EM1(5)93/GIS.164 Dt. 5.1.94 |
05-Jan-1994 |
Size :231.22 KB
|
463 |
Guidelines to be followed which executing various development works to prevent damage to the services already laid and also to prevent nay in fructuous expenditures. |
EM1(10)83/17277 Dt. 14.12.93 |
14-Dec-1993 |
Size :1.12 MB
|
464 |
Canvassing of bringing political and other influence in matters pertaining to service viz postings transfers, promotions etc. (Rule 20 of CCS Conduct 1964) |
EM1(10)83Vol.IX/14908 Dt. 28.10.93 |
28-Oct-1993 |
Size :535.33 KB
|
465 |
Anonymous/Pseudonymous complaint against fellow colleague Engineers. |
EM1(10)83/Vol.IX/14895 Dt, 28.10.93 |
28-Oct-1993 |
Size :303.51 KB
|
466 |
Initial load testing of piles. |
EM1(10)83/Vol.IX/12493 Dt. 20.9.93 |
20-Sep-1993 |
Size :723.11 KB
|
467 |
No water connection is sanctioned/boring permission given to any house/premises where service line is laid through manhole/drain. |
EM13(7)93/TC/DDA/10734 Dt. 2.8.93 |
02-Aug-1993 |
Size :336.43 KB
|
468 |
Preventive measures regarding Cholera & Gastroenteritis |
EM1(10)83Vol.IX/9960 Dt. 12.7.93 |
12-Jul-1993 |
Size :289.48 KB
|
469 |
Poor test results of samples collected by QC Wing during their inspection. |
EM1(10)83/9007 Dt. 21.06.1993 |
21-Jun-1993 |
Size :299.85 KB
|
470 |
Avoiding of emergent situation necessitating award of work orders at a very high rates. |
EM1(10)83/8756 Dt. 14.06.1993 |
14-Jun-1993 |
Size :259.2 KB
|