431 |
Uniform water consumption charges & booster charges |
EM1(10)97/8128 Dt. 22/7/97 |
22-Jul-1997 |
Size :138.03 KB
|
432 |
Supply of layout plan and unit design of the flats for annexing with hire purchase tenancy agreement and conveyance deed papers for registration. |
EM1(10)97/7258 Dt. 3/7/97 |
03-Jul-1997 |
Size :297.58 KB
|
433 |
Follow up action upon the inspection of works by CTE and CE(QC) |
EM1(10)96/16627 Dt. 19/11/96 |
19-Nov-1996 |
Size :357.97 KB
|
434 |
Horticulture Wing doing execution of work. |
EM1(10)96/16550 Dt. 18/11/96 |
18-Nov-1996 |
Size :242.13 KB
|
435 |
Standardization of display boards |
EM1(10)96/11824 Dt. 30.7.96 |
30-Jul-1996 |
Size :1.29 MB
|
436 |
i. CPWD General Specifications for Electrical works. Pt-I-External, 1994. ii. CPWD Schedule of rates (Electrical), Part-II, External, 1995. |
EM1(10)96/10932 Dt. 12.7.96 |
12-Jul-1996 |
Size :202.89 KB
|
437 |
Uniform water consumption charges and Boosting Charges Cir, No. 1(1)96-VCs Dt. 10.7.96 issued by VC, DDA Sub: System of improved and efficient supervision in the Engineering Wing. |
EM1(10)96/10387 Dt. 1.7.96 |
01-Jul-1996 |
Size :196.94 KB
|
438 |
Coordination with DESU Officers for Road cutting/widening to avoid damage to cables. |
EM1(10)96/10214 Dt. 26.6.96 |
26-Jun-1996 |
Size :183.15 KB
|
439 |
To make temporary alternative arrangement for facilitating unobstructed flow of running sewer line before blocking the same for undertaking any construction activity on the sewerage system. |
EM1(10)96/6397 Dt. 6.5.96 |
06-May-1996 |
Size :317.22 KB
|
440 |
Finalization of technical specification by SE (Elect.) before putting up the case to WAB. Monitoring sheets of CES. |
EM1(10)96/6458 Dt. 18.4.96 |
18-Apr-1996 |
Size :302.27 KB
|