| 511 |
The materials tested in the Laboratories |
EM1(10)83/17566 Dt. 17.10.1990 |
17-Oct-1990 |
Size :198.84 KB
|
| 512 |
General complaints about lack of drinking water facilities and other civic amenities |
EM1(10)83/17116 Dt. 05.10.1990 |
05-Oct-1990 |
Size :974.42 KB
|
| 513 |
Reg defects of serious nature in the building at a later date |
EM1(10)83/12587 |
01-Aug-1990 |
Size :225.52 KB
|
| 514 |
Reg Kota stone work and brick work |
EM1(10)83/7654 |
02-May-1990 |
Size :96.8 KB
|
| 515 |
Attention to comments about quality |
EM1(10)83/6440 |
09-Apr-1990 |
Size :468.84 KB
|
| 516 |
Gap between WC pan outlet and crap |
EM1(10)83/4320 |
21-Mar-1990 |
Size :122.94 KB
|
| 517 |
Reg Horticulture work SOI test checked by AE to see the gap between WC pan outlet & trap is filled up properly |
EM1(10)83/4321 |
21-Mar-1990 |
Size :275.9 KB
|
| 518 |
Reg inspections reg issue/maintenance of MBs |
EM1(10)83/2415 |
13-Feb-1990 |
Size :237.37 KB
|
| 519 |
Inspection reg use of benetenite slurry as I.S 2911(Pt.III) 1980 and reg tube strength of 28 days as per Agmt item & special condition |
EM1(10)83612 |
11-Jan-1990 |
Size :755.53 KB
|
| 520 |
Inspection reg use of benetenite slurry as I.S 2911(Pt.III) 1980 and reg tube strength of 28 days as per Agmt item & special condition |
EM1(10)83612 |
11-Jan-1990 |
Size :1.04 MB
|