| 501 |
Circular/Standing Instructions reg. Management of old records. |
EM1(10)83/6041 Dt. 30.04.1991 |
30-Apr-1991 |
|
| 502 |
Laying of Mud Phasker by triangulation, welding of MSD Grills in full length & Plastering of external walls prior to fixing of down take pipes. |
EM1(10)83/5116 Dt. 05.04.1991 |
05-Apr-1991 |
Size :271.81 KB
|
| 503 |
Reg. Segregating Quantities of lean cons. Under floors and under structures. |
EM1(10)83/4640 Dt. 25.03.1991 |
25-Mar-1991 |
Size :176.42 KB
|
| 504 |
Reg. Ensuring execution of works based on original drawings and simultaneously action by CE for supply of revised schedule of quantities in case of changed drawing. |
EM1(10)83/4448 Dt. 21.03.1991 |
21-Mar-1991 |
Size :198.96 KB
|
| 505 |
Reg. Avoiding specification and conditions/addl. Conditions, contradictory to each other |
EM1(10)83/4447 Dt. 21.03.1991 |
21-Mar-1991 |
Size :189.88 KB
|
| 506 |
About coarse sand/Bedarpur sand |
EM1(10)83/2892 Dt. 22.02.1991 |
22-Feb-1991 |
Size :225.57 KB
|
| 507 |
Reg. Convening of non-official on other outside inflius (On duct rules) |
EM1(10)83/2756 Dt. 20.02.1991 |
20-Feb-1991 |
Size :591.96 KB
|
| 508 |
Reg. Adoption of I.S. 1905-1987 for court of long and high walls |
EM1(10)83/18291 Dt. 31.10.1990 |
31-Oct-1990 |
Size :514.66 KB
|
| 509 |
Reg. Antitermite treatment |
EM1(10)83/18272 Dt. 31.10.1990 |
31-Oct-1990 |
|
| 510 |
Inspection schedule and on several occasions, records |
EM1(10)83/17567 Dt. 17.10.1990 |
17-Oct-1990 |
Size :185.37 KB
|