21 |
Regarding depositing of Performance Guarantee by Contractor. |
EM1(10)2008/Cir.(Performance Guarantee)DDA/1328 dt. 24.03.2008. |
24-Mar-2008 |
Size :120.18 KB
|
22 |
Increase in contractor’s Profit and Overheads to 15%. |
EM1(10)2007/Cir.(Contractor’s Profit)DDA/1310 dt. 19.03.2008. |
19-Mar-2008 |
Size :284.82 KB
|
23 |
Delay in providing Structural Drawings and Materials to the contractor. |
EM1(10)2007/Cir.(CAG Audit Para)DDA/610 dt. 07.02.2008. |
07-Feb-2008 |
Size :275.68 KB
|
24 |
Clearance of Encroachment from DDA site prior to Call of Tenders. |
EM1(10)2007/Cir.(CAG Audit Para)DDA/611 dt. 07.02.2008. |
07-Feb-2008 |
Size :293.81 KB
|
25 |
Scrutiny & Authentication of Structural Drawings/Designs prepared by the Consultant. |
EM1(10)2007/Cir.(CWG)DDA/497 dt. 04.02.2008. |
04-Feb-2008 |
Size :338.89 KB
|
26 |
Under Prongalation of contract and payment of escalation under clause 10CC. |
EM1(10)2007/Cir.(PAC Audit Paras)DDA/3914 dt. 25.10.2007. |
25-Oct-2007 |
Size :306.04 KB
|
27 |
Award of work and incurring of expenditure without A/A & E/S. |
EM1(10)2007/Cir.(PAC Audit Paras)DDA/3916 dt. 25.10.2007. |
25-Oct-2007 |
Size :226.61 KB
|
28 |
Award of the work higher than the prevailing market rate of a similar work. |
EM1(10)2007/Cir.(PAC Audit Paras)DDA/3915 dt. 25.10.2007. |
25-Oct-2007 |
Size :235.87 KB
|
29 |
Splitting of works Technically sanctioned by Director(Hort.) |
EM 1(10)2007/Cir.(Hort. Work))DDA/ Pt./3482 dt:24.9.2007 |
24-Sep-2007 |
Size :116.64 KB
|
30 |
Call of tenders, before the accord of formal AA & ES. |
EM 1(10)2007/Cir.(AA&ES)DDA/ 3406 dt:18.9.2007 |
18-Sep-2007 |
Size :140.25 KB
|