• Skip to Main Content
  • A- A A +
  • . .

Archived Circular

Sr.No Title File No Issue date Documents
21 Recalling of tenders in the shortest possible time which are rejected by the WAB. EM1(10)2009/Cir.(Tenders)DDA/2436 dt. 24.08.2009 24-Aug-2009

pdfSize :120.85 KB

22 Regarding sanction of Preliminary Estimates. EM1(10)2008/Cir./DDA/1297 dt. 28.03.2008. 28-Mar-2008

pdfSize :298.55 KB

23 Regarding depositing of Performance Guarantee by Contractor. EM1(10)2008/Cir.(Performance Guarantee)DDA/1328 dt. 24.03.2008. 24-Mar-2008

pdfSize :120.18 KB

24 Increase in contractor’s Profit and Overheads to 15%. EM1(10)2007/Cir.(Contractor’s Profit)DDA/1310 dt. 19.03.2008. 19-Mar-2008

pdfSize :284.82 KB

25 Delay in providing Structural Drawings and Materials to the contractor. EM1(10)2007/Cir.(CAG Audit Para)DDA/610 dt. 07.02.2008. 07-Feb-2008

pdfSize :275.68 KB

26 Clearance of Encroachment from DDA site prior to Call of Tenders. EM1(10)2007/Cir.(CAG Audit Para)DDA/611 dt. 07.02.2008. 07-Feb-2008

pdfSize :293.81 KB

27 Scrutiny & Authentication of Structural Drawings/Designs prepared by the Consultant. EM1(10)2007/Cir.(CWG)DDA/497 dt. 04.02.2008. 04-Feb-2008

pdfSize :338.89 KB

28 Under Prongalation of contract and payment of escalation under clause 10CC. EM1(10)2007/Cir.(PAC Audit Paras)DDA/3914 dt. 25.10.2007. 25-Oct-2007

pdfSize :306.04 KB

29 Award of work and incurring of expenditure without A/A & E/S. EM1(10)2007/Cir.(PAC Audit Paras)DDA/3916 dt. 25.10.2007. 25-Oct-2007

pdfSize :226.61 KB

30 Award of the work higher than the prevailing market rate of a similar work. EM1(10)2007/Cir.(PAC Audit Paras)DDA/3915 dt. 25.10.2007. 25-Oct-2007

pdfSize :235.87 KB