| 401 |
Anti Corrosive Treatment for Reinforcement Bars as per CECRI Patent No. 109784/67 |
EM 1(10)2007/Cir.(Anti Corrosive Treatment)/ DDA/ 2700 dt:27.7.07 |
27-Jul-2007 |
Size :177.28 KB
|
| 402 |
Strict Compliance of all codal formalities and departmental instructions regarding execution of various works in DDA. |
EM1(10)20056/DDA/Cir(AA&ES)/Deviation/712 dt 2.3.2007 |
02-Mar-2007 |
Size :336.94 KB
|
| 403 |
CTE intensive examination of the w/o C/o approach road from Dwarka Dwar to NH8(Old Gurgoan road) through Cantonment Area. |
EM1(10)2006/DDA/Cir(App.Road) |
18-Dec-2006 |
Size :524.3 KB
|
| 404 |
Sign Boards(Retro reflection) |
EM1(10)2006/DDA/Cir(retro reflection)3924 |
13-Nov-2006 |
Size :131.31 KB
|
| 405 |
Price preference policy for CPSE Firms |
EM1(10)2006/DDA/Cir(PPP) |
25-Aug-2006 |
Size :540.66 KB
|
| 406 |
Accidents due to missing MH covers, open pits and Bore Holes. |
EM1(10)2006/DDA/Cir(Missing MH covers&BHs) |
18-Aug-2006 |
Size :212.48 KB
|
| 407 |
Circular on adoption of CPWD Electrical Specification-2005. |
EM1(10)2006/DDA/Cir(Electrical Specification)/ |
10-Jul-2006 |
Size :129.12 KB
|
| 408 |
Circular on delay in issue of Architectural Drawing/Structural Drawings/Stipulated Material. |
EM1(10)2006/DDA/Pt-1 |
20-Jun-2006 |
Size :291.88 KB
|
| 409 |
Proper design of crust thickness of Road as per IRC-37. |
EM1(10)2005/ |
18-Apr-2006 |
Size :290.41 KB
|
| 410 |
Earth Filling in low lying areas. |
EM1(10)2005/Cir(Play Field)/DDA Modified vide even No 2347 dt 6-7-06 |
18-Apr-2006 |
Size :391.53 KB
|