| 301 |
Timely action in respect of contracts where there is a delayed in performance and where action to be taken under clause 2 & 3 of the contractor |
EM.1(10)83/10872 Dt: 24.9.1985 |
24-Sep-1985 |
Size :304.71 KB
|
| 302 |
Reg. Local purchase of material. |
EM.1(10)83/10846 Dt: 23.9.1985 |
23-Sep-1985 |
Size :298.65 KB
|
| 303 |
Reg. Increase in the amount of lump-sum security deposit. |
EM.1(10)83/10773 Dt: 20.9.1985 |
20-Sep-1985 |
Size :348.39 KB
|
| 304 |
Reg. Certain item brought by the Contractor. |
EM.1(10)83/8868 Dt: 8.8.1985 |
08-Aug-1985 |
Size :167.83 KB
|
| 305 |
Reg. In violence of Circular No. 80. |
EM.1(10)83/8622 Dt: 5.8.1985 |
05-Aug-1985 |
Size :115.33 KB
|
| 306 |
Reg. Grant of secured advance. |
EM.1(10)83/7884 Dt: 22.7.1985 |
22-Jul-1985 |
Size :536.59 KB
|
| 307 |
Regarding stream lining the procedure and rules in respect of and contract in CPWD. Report on the study conducted by DP & AR amendment to CE/COM/800 |
EM.1(10)83/6394 Dt: 19.6.1985 |
19-Jun-1985 |
Size :758.7 KB
|
| 308 |
Reg. Amendment to rule for enlistment of contractors and CPWD. |
EM.1(10)83/4393 Dt: 7.5.1985 |
07-May-1985 |
Size :266.21 KB
|
| 309 |
Reg. Performance report in respect of all works casting of Rs. 5 lacks and above. |
EM.1(10)83/2956 Dt: 29.3.1985 |
29-Mar-1985 |
Size :110.07 KB
|
| 310 |
Reg. Inspection of the works. |
EM.1(10)83/2664 Dt: 20.3.1985 |
20-Mar-1985 |
Size :130.1 KB
|